Jenn finally had some time to work on the project, so we got started by installing the primary power wires to the two load cells. I cut them to length and then crimped on the terminals. I slipped the heat shrink over the crimps after taking this picture, but I wanted to show how nice the crimps come out from the hydraulic crimper from Harbor Freight.